The International Energy Conservation Code, 2018 Edition, is modified as follows:

A. Section C101.1 Title, is hereby amended by replacing “Name of Jurisdiction” with “City of Sedona.”

B. Section C104.2, Schedule of permit fees, is hereby amended by deleting the section in its entirety and inserting the following:

The fees for activities and services performed by the department in carrying out its responsibilities under this code shall be assessed in accordance with SCC 15.05.060.

C. Section C108.2, Issuance, is hereby amended by removing the first sentence in its entirety and inserting the following:

A stop work order shall be in writing and shall be given to the owner of the property, to the owner’s authorized agent, or to the person performing the work, or shall be posted on the structure or on site in a conspicuous location.

D. Section C108.4, Failure to comply, is hereby deleted in its entirety and replaced by the following:

Section C108.4 Failure to comply and/or removal of stop work notice. Any person who shall continue or allow the continuance of any work in or about the structure or property after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, or any person who removes, or causes the removal of, the stop work notice without the consent of the City, shall be subject to fines and penalties as set by the applicable governing authority.

E. Section C109, Board of Appeals, is hereby amended by deletion in its entirety and substituting the following:

Appeals of decisions made by the code official shall be to the Board of Appeals as established in the 2018 International Building Code as amended by the City of Sedona.

F. Appendix CB is hereby added as a new appendix as follows:

Appendix CB Electrical Vehicle Ready Parking Areas – Commercial

CB 101.1 General. These provisions shall be applicable for new construction where electrical vehicle ready provisions are required in Section CB 201.1.

CB 201.1 Electrical vehicle ready parking spaces. For every newly permitted structure governed by, and within the scope of, the International Building Code, with more than 9 parking spaces, 5 percent of the total number of parking spaces shall be capable of supporting future electric vehicle charging stations (EVCS) and said spaces shall be identified on the construction documents along with the location of the proposed EVCS. At least one EVCS shall be located in common use areas and available for use by all residents. (Note: When calculating the required electrical vehicle ready parking spaces, rounding shall be used to the nearest whole number. Where the calculations fall at the midpoint of a whole number, the number must be rounded up.)

CB 201.2 Design and installation requirements – Single EVCS required. When only one EVCS space is required, a 208/240-volt individual branch circuit or a listed raceway to accommodate a future individual branch circuit shall be installed. The raceway shall not be less than trade size 1 (nominal 1-inch inside diameter). The raceway shall originate at the main service or subpanel and shall terminate into a listed cabinet, box or other enclosure in close proximity to the proposed location of the electric vehicle charger. Construction documents shall identify the raceway termination point. The service panel or subpanel circuit directory shall provide capacity to install a 40-ampere minimum dedicated branch circuit and space(s) reserved to permit installation of a branch circuit overcurrent device. Electric vehicle supply equipment shall be installed in accordance with NFPA 70.

CB 201.3 Design and installation requirements – Multiple EVCS required. Construction documents shall indicate the raceway termination point and proposed location of future EVCS and electric vehicle chargers. Constructions documents shall also provide information on amperage of future electric vehicle supply equipment (EVSE), raceway methods(s) wiring schematics and electrical panel service capacity and electrical system, including any on-site distribution transformer(s), have sufficient capacity to simultaneously charge all electric vehicles at all required EVCS at the full rated amperage of the EVSE. Plan design shall be based upon 40-ampere minimum branch circuit. Raceways and related components that are planned to be installed underground, enclosed, inaccessible or in concealed areas and spaces shall be installed at time of the original construction. Electric vehicle supply equipment shall be installed in accordance with NFPA 70.

CB 201.4 Identification. The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future electric vehicle charging as “EV CAPABLE”. The raceway termination location shall be permanently and visibly marked as “EV CAPABLE”.

G. Section R101.1, Title, is hereby amended by replacing “Name of Jurisdiction” with “City of Sedona.”

H. Section R104.2, Schedule of permit fees, is hereby amended by deleting the section in its entirety and inserting the following:

The fees for activities and services performed by the department in carrying out its responsibilities under this code shall be assessed in accordance with SCC 15.05.060.

I. Section R108.2, Issuance, is hereby amended by removing the first sentence in its entirety and inserting the following:

A stop work order shall be in writing and shall be given to the owner of the property, to the owner’s authorized agent, or to the person performing the work, or shall be posted on the structure or on site in a conspicuous location.

J. Section R108.4, Failure to comply, is hereby deleted in its entirety and replaced by the following:

Section R108.4 Failure to comply and/or removal of stop work notice. Any person who shall continue or allow the continuance of any work in or about the structure or property after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, or any person who removes, or causes the removal of, the stop work notice without the consent of the City, shall be subject to fines and penalties as set by the applicable governing authority.

K. Section R109, Board of Appeals, is hereby amended by deletion in its entirety and substituting the following:

Appeals of decisions made by the code official shall be to the Board of Appeals as established in the 2018 International Building Code as amended by the City of Sedona.

[Ord. 2019-05 § 1, 9-24-2019; Res. 2019-18 Exh. A, 9-24-2019].